The Safety Pelican
Knowledge center

KnowledgeLiferafts

When is a liferaft service due?

Find your liferaft’s next service date, understand how often it needs servicing and check which other expiry dates matter. Explore this guide to discover what happens during a service, when your raft may need attention sooner and how to arrange servicing when it’s due or overdue.

Sources checked September 9, 2026

A liferaft can reach its service date without ever being used. For an owner who has kept it neatly stowed aboard, that can seem surprising: the container looks much as it did when it arrived. Inside, however, are inflatable chambers, an inflation system and survival equipment whose condition cannot be established from the outside.

The service label is the starting point for knowing when that equipment needs attention. Understanding what the date refers to—and which other dates belong alongside it—makes it easier to keep the raft ready throughout your sailing plans.

What happens during a service?

At a service station, technicians unpack the raft so they can inspect and test the equipment normally concealed inside its container or carrying bag. The work follows the manufacturer’s procedures for that particular model.

VIKING’s description of a RescYou service includes inflating and pressure-testing the raft, inspecting its condition, checking the inflation cylinder’s contents and examining the emergency equipment. After the necessary work, the raft is repacked, sealed and labelled, and a service certificate is issued. This is why an exterior inspection aboard cannot replace the scheduled workshop service.

Inflated liferafts opened on the Safety Pelican workshop floor for servicing

Finding the service date for your raft

Look for the servicing label on the rigid container or soft carrying bag, known as a valise. Read the wording beside each date: a manufacture date, a last-service date and a next-service date describe different events.

VIKING liferaft container label with separate Latest inspection and Next service fields at the bottom, marked 03/18 and 03/21
VIKING container label. The bottom row separates the last inspection from the next service date. Historical example. Photo source.
Blank Plastimo Cruiser label with a servicing table on the right headed Station number, Servicing date and Next service
Plastimo Cruiser label. The table on the right records the servicing date and next service. This unused label shows the layout. Photo: Waveinn.

The latest service certificate provides the accompanying record. Its manufacturer and serial number should identify the same raft you have aboard. Where the model, capacity and emergency pack are recorded, those details should also agree.

For US Coast Guard-approved equipment covered by its servicing procedure, the container sticker identifies an expiry month and year, while the certificate records the manufacturer, serial number and servicing date. Other documentation formats may differ, so a certificate should not be assumed to show a next-due date simply because it shows when the work was done.

Missing paperwork is particularly common when equipment comes with a second-hand boat. A readable identification label gives the manufacturer or an authorised station something to investigate. If the records conflict or cannot be recovered, the raft’s service status needs resolving before it can be relied upon.

Why some rafts are serviced more often than others

The servicing interval belongs to the particular raft and its approved arrangement. It cannot be established from the manufacturer’s name alone.

Standard SOLAS liferafts normally follow a twelve-month servicing interval. SOLAS is the international convention governing safety of life at sea. Specifically approved extended-service arrangements can differ: VIKING’s S30 range combines servicing every thirty months with annual onboard inspections. That longer interval depends on the applicable approval and inspection conditions. Read the VIKING S30 extended-service guide for the onboard checks and full-service cycle.

Leisure rafts can follow different manufacturer schedules. VIKING recommends three-year servicing for its RescYou range, while Switlik lists a five-year recommendation for its current compressed-air CPR, OPR and SAR-6 models. These examples explain why owners encounter different dates; they are not interchangeable schedules.

The vessel’s requirements also matter. Private use, commercial operation and the applicable flag or survey arrangements can affect what is accepted. When these circumstances change, the equipment’s servicing arrangements deserve another review.

The other dates to keep alongside it

A liferaft installation may have several dates that fall at different times.

One belongs to the hydrostatic release unit, where fitted. This device releases the container from its securing arrangement if the vessel sinks. Its replacement date is separate from the raft’s service date. Hammar, for example, offers H20 R and H20 RX variants with twenty-four- and thirty-month installed lives. The installed unit’s expiry marking must be read separately from its manufacturing code. These disposable units are replaced at the end of their life; servicing the raft does not renew them.

Hammar instructional illustration showing the marked expiry month on the yellow band around an H20 release unit
The expiry month is marked on the yellow band. Illustration: Hammar.

Supplies inside the emergency pack can have their own expiry dates too. They are examined during servicing under the applicable procedures. Separately carried supplies, such as those in a grab bag, also need attention; they are outside the sealed raft’s service record.

The raft’s age introduces another distinction. A service interval describes the period between services, while a manufacturer’s stated service-life limit concerns how long that model may remain in use. Warranty cover is a separate matter. For an older raft, establishing its manufacture date and model-specific limits helps determine whether further servicing is an option.

When attention is needed before the printed date

A future service date does not account for damage that happens afterwards. A cracked container, broken securing straps or seals, suspected water entry or an accidental deployment warrants advice from a station authorised for the equipment.

For vessels covered by US regulation 46 CFR 122.730, container damage and broken straps or seals are explicit servicing triggers. The broader practical point is to report a change in condition when it happens rather than waiting for the scheduled date. Keep the container closed and photograph the exterior so the station can understand the problem.

If the service date is approaching—or has passed

An approaching deadline is easier to manage while there is still a choice of ports and workshop dates. If the raft is already overdue, contact an appropriate station with its identification and records, and establish the vessel’s operating position before departure.

A booking does not extend the servicing interval. Where a regulatory deferment is available, its conditions come from the applicable authority. Extended-service rafts have their own approval limits; a thirty-month arrangement should not be treated as thirty months plus an assumed grace period.

For a yacht moving between the Caribbean, the United States and Europe, the next suitable station may be somewhere other than the original supplier’s port. Manufacturer networks, the US Coast Guard’s servicing directory and the Dutch ILT’s recognised-station information provide useful starting points within their respective scope. The station still needs to confirm support for the exact make and model.

Preparing the enquiry

The Safety Pelican can review the equipment details, check its service scope and discuss timing. A useful enquiry brings together:

  • Clear photographs of the raft and identification labels.
  • The latest service certificate or available history.
  • The vessel’s flag, operating use and current location.
  • Any damage or uncertainty about the records.
  • The date the raft needs to be back aboard.

Sending these details early allows the service discussion to take account of the voyage, charter or survey you are preparing for.

Sources and further reading

View all 10 references
Have a question?Send us a message